Sign In | Join Free | My burrillandco.com |
|
Ask Lasest Price | |
Certification : | CE ISO GOST |
Price : | Negotiation |
Delivery Time : | 45 workdays |
Payment Terms : | L/C, T/T |
Supply Ability : | 500 sets per year |
Electrical 5T Span 15M Double Girder Overhead Crane For Warehouses
Introduction:
Double-girder overhead crane is an important tool and equipment for mechanization and automation of production process in modern industrial production and lifting and transportation. Therefore, double-girder overhead cranes are widely used in indoor and outdoor industrial and mining enterprises, iron and steel chemical industry, railway transportation, port terminals and logistics turnover and other departments and places.
Technical Parameter:
Cap (t) | 5/ 10 | ||||||||
Span (m) | 10.5 | 13.5 | 16.5 | 19.5 | 22.5 | 25.5 | 28.5 | 31.5 | |
Main Dimensions (mm) | H | 1763/1800 | |||||||
H1 | 765 | ||||||||
H2 | 24 | 126 | 226 | 376 | 526 | 676 | 826 | 976 | |
H3 | 2396 | 2546 | 2646 | 2796 | 2946 | 3096 | 3246 | 3396 | |
H4 | 71-552 | ||||||||
K | 1400-2000 | ||||||||
W | 3400 | 3550 | 5000 | ||||||
B | 5054 | 5204 | 5948 | ||||||
b | 230 | ||||||||
Max. Wheel Load (KN) | 72-152 | ||||||||
Total Power (KW) | 10-15.5 | ||||||||
Lifting Height (m) | 16 | ||||||||
Hoisting Speed (m/min) | 5 |
Composition:
Overhead cranes are generally composed of three major parts: mechanical, electrical and metal structures. The appearance of the bridge crane is like a single-span flat-panel bridge whose two ends are supported on two parallel overhead rails.
Mechanical part: It is divided into three mechanisms, namely the
lifting mechanism, the trolley running mechanism and the cart
running mechanism. The hoisting mechanism is used to vertically
lift objects, the trolley operating mechanism is used to carry the
load for lateral movement; the cart operating mechanism is used to
vertically move the hoisting trolley and the objects to achieve
three-dimensional space for handling and loading and unloading
goods. .
Metal structure part: It is composed of bridge frame and small
frame.
Electrical part: consists of electrical equipment and electrical
lines.
Application:
Double girder overhead crane is an important tool and equipment to realize mechanization and automation of production process in modern industrial production and lifting and transportation. Therefore, double-girder overhead cranes are widely used in indoor and outdoor industrial and mining enterprises, iron and steel chemical industry, railway transportation, port terminals and logistics turnover departments and places.
Photos:
![]() |